Planned measures in Hördter Rheinaue area:

- Reinforcement of the existing dyke
- Construction of a new main dyke at some distance from the river Rhine
- Construction of two new pumping stations and reinforcement of two existing ones
- In case of polder operation mobile systems for pumping will be used too
- Construction of three apertures in the existing dyke to allow ecological flooding
- Construction of three spillways in the existing dyke to allow the inflow of water in case of operation