Planned measures in the Kleine Nete catchment:

- Excavation of ca. 300,000 m3 of sands
- Construction of new dikes on the right river bank of the Kleine Nete
- Construction of a new meander with smaller dimensions than the current river
- Raising the upstream water level by 50 cm to preserve the alder swamp woods
- Construction of diverse recreational facilities to increase attractiveness